OAO Gazprom’s approach to providing services is based on applying integrated solutions that range from estimating how well the region is provided with energy resources to designing construction and maintenance projects for low pressure networks with the installation of proper gas-using equipment.
Regional Power Industry
Power industry development plan for the Astrakhan region:
- Reconstruction and re-equipment of Astrakhan’s state district power plant
- Modernization of Severnaya’s thermal power plant by installing turbine PT-30/35-35 , thus increasing the plant capacity from 24 to 42 MW
- Construction of a new gas turbine unit thermal power station at Astrakhan’s gas processing plant with the total electric capacity 192 MW on the basis of GTU-64 blocks
Gas supply and distribution in the regions of Russia
OAO Promgaz has conducted pre-investment research for Gas Supply and Distribution Programmes of Russian regions for 2003, 2004, 2005 and has done the work, aimed at the justification of investments in the construction of gas supply and distribution facilities in 44 Russian Federation constituents. The company has also developed its design and estimate documentation for almost 500 gas distribution objects with a total length of about 4.5 thousand km.
These projects of OAO Promgaz deserve special attention:
- The Irkutsk Region gas supply and distribution
- The Kurgan Region gas supply and distribution investment project
- The Krasnodar Territory general gas supply and distribution scheme